  • \( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \) \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)\(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\) \(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\)\(\newcommand{\AA}{\unicode[.8,0]{x212B}}\)

    Organize how changes to a design in the development and realization stages can be registered and processed in BIM. These changes may refer to:

    • Change to a property of a symbol (e.g. lengthening of a wall)
    • Change of the type of a symbol (e.g. change of family for a door)
    • Change in a relation between symbols (e.g. relocation of a door in a wall)
    • Change in a time property of a symbol (e.g. as a result of a scheduling change)

    Organize the process of change management in both stages as a series of tasks that reflect the above types of changes and take into account possible causes of change, such as:

    • Changes in the brief (e.g. new activities added)
    • Changes in the budget (e.g. increase of façade cost necessitating reduction of cost elsewhere)
    • Changes in an aspect of the design (e.g. change in the heating solution or the fire rating of internal doors and ensuing interfacing issues – not just clash detection)
    • Changes in the construction schedules (e.g. due to delays in the delivery of components or to bad weather)
    • Errors in construction (e.g. wrong dimensioning or specifications of an element)

    Deliverables

    1. Process and information diagrams, accompanied by short explanatory comments
    2. Basic model in a BIM editor demonstrating the way changes can be implemented
    3. Short overview of findings (two A4 sheets)

    Roles

    If the exercise is a group assignment, consider roles for the following aspects:

    • Process management
    • Information management
    • BIM modelling
    • Case analyses (for finding realistic examples)

    This page titled 4.3: Exercise II- change management is shared under a CC BY-NC-SA 4.0 license and was authored, remixed, and/or curated by Alexander Koutamanis (TU Delft Open Textbooks) via source content that was edited to the style and standards of the LibreTexts platform; a detailed edit history is available upon request.