4.4: Exercise III- circular energy transition
- Page ID
- 20740
\( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \) \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)\(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\) \(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\)\(\newcommand{\AA}{\unicode[.8,0]{x212B}}\)
The planned energy transition in the Netherlands means that most buildings have to undergo an expensive renovation to meet new standards. To reduce costs, one can adopt a circular approach to both components or materials released from existing buildings and the new components and subsystems that will be added to the buildings. Organize the following tasks for a typical Dutch single-family house:
- Document the existing situation in a model appropriate for renovation, i.e. including realization phases, distinction between existing and planned, what should remain and what should be removed
- Identify in the model components and materials that should be extracted (e.g. radiators: the house will have underfloor heating), explaining how identification takes place (preferably automatically) in the model
- Estimate the expected circularity form for these components and materials (recycle, remanufacture, repurpose, re-use etc.), explaining which factors play a role (weathering, wear, interfacing with other elements etc.) and how these factors can be detected in the model
- Identify which elements should be upgraded and specify what this entails in the model (paying attention to phasing and element type changes)
- Specify how new elements (for the renovation) should be added to the model to support the above in the remaining lifecycle of the house
- Make a time schedule for the renovation in 4D BIM
Deliverables
- Process and information diagrams, accompanied by short explanatory comments
- Incomplete model in a BIM editor containing demonstrations of your solutions
- Schedules for circularity analyses in BIM
- Short overview and table of contents (two A4 sheets)
Roles
If the exercise is a group assignment, consider roles for the following aspects:
- Process management
- Information management
- BIM modelling
- Analyses in BIM (using schedules – probably more than one group member)
- Legal and technical aspects of the energy transition
- Building documentation (emphasis on how to deal with incompleteness and uncertainty)
- Subsystem integration
- Circularity in design (technical aspects)