  • \( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \) \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)\(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\) \(\newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\) \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\) \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\) \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\) \( \newcommand{\Span}{\mathrm{span}}\)\(\newcommand{\AA}{\unicode[.8,0]{x212B}}\)

    Adventures with Error Correction\(^1\)

    The designers of the computer systems at the Xerox Palo Alto Research Center in the early 1970s encountered a series of experiences with error-detecting and error-correcting memory systems. From these experiences follow several lessons, some of which are far from intuitive, and all of which still apply several decades later.

    MAXC. One of the first projects undertaken in the newly-created Computer Systems Laboratory was to build a time-sharing computer system, named MAXC. A brand new 1024-bit memory chip, the Intel 1103, had just appeared on the market, and it promised to be a compact and economical choice for the main memory of the computer. But since the new chip had unknown reliability characteristics, the MAXC designers implemented the memory system using a few extra bits for each 36-bit word, in the form of a single-error-correction, double-error-detection code.

    Experience with the memory in MAXC was favorable. The memory was solidly reliable—so solid that no errors in the memory system were ever reported.

    The Alto. When the time came to design the Alto personal workstation, the same Intel memory chips still appeared to be the preferred component. Because these chips had performed so reliably in MAXC, the designers of the Alto memory decided to relax a little, omitting error correction. However, they were still conservative enough to provide error detection, in the form of one parity bit for each 16-bit word of memory.

    This design choice seemed to be a winner because the Alto memory systems also performed flawlessly, at least for the first several months. Then, mysteriously, the operating system began to report frequent memory-parity failures.

    Some background: the Alto started life with an operating system and applications that used a simple typewriter-style interface. The display was managed with a character-by-character teletype emulator. But the purpose of the Alto was to experiment with better things. One of the first steps in that direction was to implement the first what-you-seeis-what-you-get editor, named Bravo. Bravo took full advantage of the bit-map display, filling it not only with text, but also with lines, buttons, and icons. About half the memory system was devoted to display memory. Curiously, the installation of Bravo coincided with the onset of memory parity errors.

    It turned out that the Intel 1103 chips were pattern-sensitive—certain read/write sequences of particular bit patterns could cause trouble, probably because those pattern sequences created noise levels somewhere on the chip that systematically exceeded some critical threshold. The Bravo editor's display management was the first application that generated enough different patterns to have an appreciable probability of causing a parity error. It did so, frequently.

    Lesson \(\PageIndex{1a}\):

    There is no such thing as a small change in a large system. A new piece of software can bring down a piece of hardware that is thought to be working perfectly. You are never quite sure just how close to the edge of the cliff you are standing.

    Lesson \(\PageIndex{1b}\):

    Experience is a primary source of information about failures. It is nearly impossible, without specific prior experience, to predict what kinds of failures you will encounter in the field.

    Back to MAXC. This circumstance led to a more careful review of the situation on MAXC. MAXC, being a heavily used server, would be expected to encounter at least some of this pattern sensitivity. It was discovered that although the error-correction circuits had been designed to report both corrected errors and uncorrectable errors, the software logged only uncorrectable errors and corrected errors were being ignored. When logging of corrected errors was implemented, it turned out that the MAXC's Intel 1103's were actually failing occasionally, and the error-correction circuitry was busily setting things right. 

    Lesson \(\PageIndex{1c}\):

    Whenever systems implement automatic error masking, it is important to follow the safety margin principle, by tracking how often errors are successfully masked. Without this information, one has no way of knowing whether the system is operating with a large or small safety margin for additional errors. Otherwise, despite the attempt to put some guaranteed space between yourself and the edge of the cliff, you may be standing on the edge again.

    The Alto 2. In 1975, it was time to design a follow-on workstation, the Alto 2. A new generation of memory chips, this time with 4096 bits, was now available. Since it took up much less space and promised to be cheaper, this new chip looked attractive, but again there was no experience with its reliability. The Alto 2 designers, having been made wary by the pattern sensitivity of the previous generation chips, again resorted to a single-error-correction, double-error-detection code in the memory system.

    Once again, the memory system performed flawlessly. The cards passed their acceptance tests and went into service. In service, not only were no double-bit errors detected, only rarely were single-bit errors being corrected. The initial conclusion was that the chip vendors had worked the bugs out and these chips were really good.

    About two years later, someone discovered an implementation mistake. In one quadrant of each memory card, neither error correction nor error detection was actually working. All computations done using memory in the misimplemented quadrant were completely unprotected from memory errors.

    Lesson \(\PageIndex{1d}\):

    Never assume that the hardware actually does what it says in the specifications.

    Lesson \(\PageIndex{1e}\):

    It is harder than it looks to test the fault tolerance features of a fault-tolerant system.

    One might conclude that the intrinsic memory chip reliability had improved substantially—so much that it was no longer necessary to take heroic measures to achieve system reliability. Certainly the chips were better, but they weren't perfect. The other effect here is that errors often don't lead to failures. In particular, a wrong bit retrieved from memory does not necessarily lead to an observed failure. In many cases a wrong bit doesn't matter; in other cases it does but no one notices; in still other cases, the failure is blamed on something else.

    Lesson \(\PageIndex{1f}\):

    Just because it seems to be working doesn't mean that it actually is.

    The bottom line. One of the designers of MAXC and the Altos, Butler Lampson, suggests that the possibility that a failure is blamed on something else can be viewed as an opportunity, and it may be one of the reasons that PC manufacturers often do not provide memory parity checking hardware. First, the chips are good enough that errors are rare. Second, if you provide parity checks, consider who will be blamed when the parity circuits report trouble: the hardware vendor. Omitting the parity checks probably leads to occasional random behavior, but occasional random behavior is indistinguishable from software error and is usually blamed on the software.

    Lesson \(\PageIndex{1g}\):

    In Lampson's words: "Beauty is in the eye of the beholder. The various parties involved in the decisions about how much failure detection and recovery to implement do not always have the same interests."


    \(^1\) These experiences were reported by Butler Lampson, one of the designers of the MAXC computer and the Alto personal workstations at Xerox Palo Alto Research Center.

     

    Risks of Rarely-Used Procedures: The National Archives 

    The National Archives and Record Administration of the United States government has the responsibility, among other things, of advising the rest of the government how to preserve electronic records such as e-mail messages for posterity. Quite separate from that responsibility, the organization also operates an e-mail system at its Washington, D.C. headquarters for a staff of about 125 people; about 10,000 messages a month pass through this system. To ensure that no messages are lost, it arranged with an outside contractor to perform daily incremental backups and to make periodic complete backups of its e-mail files. On the chance that something may go wrong, the system has audit logs that track actions regarding incoming and outgoing mail as well as maintenance on files. 

    Over the weekend of June 18–21, 1999, the e-mail records for the previous four months (an estimated 43,000 messages) disappeared. No one has any idea what went wrong—the files may have been deleted by a disgruntled employee or a runaway housecleaning program, or the loss may have been caused by a wayward system bug. In any case, on Monday morning when people came to work, they found that the files were missing.

    On investigation, the system managers reported that the audit logs had been turned off because they were reducing system performance, so there were no clues available to diagnose what went wrong. Moreover, since the contractor’s employees had never gotten around to actually performing the backup part of the contract, there were no backup copies. It had not occurred to the staff of the Archives to verify the existence of the backup copies, much less to test them to see if they could actually be restored. They assumed that since the contract required it, the work was being done.

    The contractor’s project manager and the employee responsible for making backups were immediately replaced. The Assistant Archivist reports that backup systems have now been beefed up to guard against another mishap, but he added that the safest way to save important messages is to print them out.\(^2\)

    Lesson \(\PageIndex{2}\):

    Avoid rarely used components. Rarely used failure-tolerance mechanisms, such as restoration from backup copies, must be tested periodically. If they are not, there is not much chance that they will work when an emergency arises. Fire drills (in this case, performing a restoration of all files from a backup copy) seem disruptive and expensive, but they are not nearly as disruptive and expensive as the discovery, too late, that the backup system isn’t really operating. Even better, design the system so that all the components are exposed to day-to-day use, so that failures can be noticed before they cause real trouble.


    \(^2\) "Archives Loses 43,000 E-Mails; officials can't explain summer erasure; backup system failed." The Washington Post, Thursday, January 6, 2000, page A17. 

     

    Non-independent Replicas and Backhoe Fade

    In Eagan, Minnesota, Northwest airlines operated a computer system named WorldFlight that managed the Northwest flight dispatching database, provided weight-and-balance calculations for pilots, and managed e-mail communications between the dispatch center and all Northwest airplanes. It also provided data to other systems that managed passenger check-in and the airline’s Web site. Since many of these functions involved communications, Northwest contracted with U.S. West, the local telephone company at that time, to provide these communications in the form of fiber-optic links to airports that Northwest serves, to government agencies such as the Weather Bureau and the Federal Aviation Administration, and to the Internet. Because these links were vital, Northwest paid U.S. West extra to provide each primary link with a backup secondary link. If a primary link to a site failed, the network control computers automatically switched over to the secondary link to that site.

    At 2:05 p.m. on March 23, 2000, all communications to and from WorldFlight dropped out simultaneously. A contractor who was boring a tunnel (for fiber optic lines for a different telephone company) at the nearby intersection of Lone Oak and Pilot Knob roads accidentally bored through a conduit containing six cables carrying the U.S. West fiber-optic and copper lines. In a tongue-in-cheek analogy to the fading in and out of long-distance radio signals, this kind of communications disruption is known in the trade as "backhoe fade." WorldFlight immediately switched from the primary links to the secondary links, only to find that they were not working, either. It seems that the primary and secondary links were routed through the same conduit, and both were severed.

    Pilots resorted to manual procedures for calculating weight and balance, and radio links were used by flight dispatchers in place of the electronic message system, but about 125 of Northwest’s 1700 flights had to be canceled because of the disruption, about the same number that are canceled when a major snowstorm hits one of Northwest’s hubs. Much of the ensuing media coverage concentrated on whether or not the contractor had followed "dig-safe" procedures that are intended to prevent such mistakes. But a news release from Northwest at 5:15 p.m. blamed the problem entirely on U.S. West. "For such contingencies, U.S. West provides to Northwest a complete redundancy plan. The U.S. West redundancy plan also failed."\(^3\)

    In a similar incident, the ARPAnet, a predecessor to the Internet, had seven separate trunk lines connecting routers in New England to routers elsewhere in the United States. All the trunk lines were purchased from a single long-distance carrier, AT&T. On December 12, 1986, all seven trunk lines went down simultaneously when a contractor accidentally severed a single fiber-optic cable running from White Plains, New York to Newark, New Jersey.\(^4\)

    A complication for communications customers who recognize this problem and request information about the physical location of their communication links is that in the name of security, communications companies sometimes refuse to reveal it.

    Lesson \(\PageIndex{3}\):

    The calculation of mean time to failure of a redundant system depends critically on the assumption that failures of the replicas are independent. If they aren’t independent, then the replication may be a waste of effort and money, while producing a false complacency. This incident also illustrates why it can be difficult to test fault tolerance measures properly. What appears to be redundancy at one level of abstraction turns out not to be redundant at a lower level of abstraction.


    \(^3\) Tony Kennedy. "Cut cable causes cancellations, delays for Northwest Airlines." Minneapolis Star Tribune, March 22, 2000. 

    \(^4\) Peter G. Neumann. Computer Related Risks (Addison-Wesley, New York, 1995), page 14.

     

    Human Error May Be the Biggest Risk

    Telehouse was an East London "telecommunications hotel," a seven-story building housing communications equipment for about 100 customers, including most British Internet companies, many British and international telephone companies, and dozens of financial institutions. It was designed to be one of the most secure buildings in Europe, safe against "fire, flooding, bombs, and sabotage." Accordingly, Telehouse had extensive protection against power failure, including two independent connections to the national electric power grid, a room full of batteries, and two diesel generators, along with systems to detect failures in supply and automatically cut over from one backup system to the next, as needed.

    On May 8, 1997, all the computer systems went off line for lack of power. According to Robert Bannington, financial director of Telehouse, "It was due to human error." That is, someone pulled the wrong switch. The automatic power supply cutover procedures did not trigger because they were designed to deploy on failure of the outside power supply, and the sensors correctly observed that the outside power supply was intact.\(^5\)

    Lesson \(\PageIndex{4a}\):

    The first step in designing a fault-tolerant system is to identify each potential fault and evaluate the risk that it will happen. People are part of the system, and mistakes made by authorized operators are typically a bigger threat to reliability than trees falling on power lines.

    Anecdotes concerning failures of backup power supply systems seem to be common. Here is a typical report of an experience in a Newark, New Jersey, hospital operating room that was equipped with three backup generators: "On August 14, 2003, at 4:10 pm EST, a widespread power grid failure caused our hospital to suffer a total OR power loss, regaining partial power in 4 hours and total restoration 12 hours later... When the backup generators initially came on-line, all ORs were running as usual. Within 20 minutes, one parallel-linked generator caught fire from an oil leak. After being subjected to twice its rated load, the second in-line generator quickly shut down... Hospital engineering, attempting load-reduction to the single surviving generator, switched many hospital circuit breakers off. Main power was interrupted to the OR."\(^6\)

    Lesson \(\PageIndex{4b}\):

    A backup generator is another example of a rarely used component that may not have been maintained properly. The last two sentences of that report reemphasize Lesson \(\PageIndex{4a}\).

    For yet another example, the M.I.T. Information Services and Technology staff posted the following system services notice on April 2, 2004: "We suffered a power failure in W92 shortly before 11 AM this morning. Most services should be restored now, but some are still being recovered. Please check back here for more information as it becomes available." A later posting reported: "Shortly after 10 AM Friday morning the routine test of the W92 backup generator was started. Unknown to us was that the transition of the computer room load from commercial power to the backup generator resulted in a power surge within the computer room's Uninterruptable [sic] Power Supply (UPS). This destroyed an internal surge protector, which started to smolder. Shortly before 11 AM the smoldering protector triggered the VESDA® smoke sensing system within the computer room. This sensor triggered the fire alarm, and as a safety precaution forced an emergency power down of the entire computer room."\(^7\)

    Lesson \(\PageIndex{4c}\):

    A failure masking system not only can fail, it can cause a bigger failure than the one it is intended to mask.


    \(^5\) Robert Uhlig. "Engineer pulls plug on secure bunker." Electronic Telegraph, (9 May 1997). 

    \(^6\) Ian E. Kirk, M.D. and Peter L. Fine, M.D. "Operating by Flashlight: Power Failure and Safety Lessons from the August, 2003 Blackout." Abstracts of the Annual Meeting of the American Society of Anesthesiologists, October 2005.

    \(^7\) Private internal communication.

     

    Introducing a Single Point of Failure

    "[Rabbi Israel Meir HaCohen Kagan described] a real-life situation in his town of Radin, Poland. He lived at the time when the town first purchased an electrical generator and wired all the houses and courtyards with electric lighting. One evening something broke within the machine, and darkness descended upon all of the houses and streets, and even in the synagogue.

    "So he pointed out that before they had electricity, every house had a kerosene light—and if in one particular house the kerosene ran out, or the wick burnt away, or the glass broke, that only that one house would be dark. But when everyone is dependent upon one machine, darkness spreads over the entire city if it breaks for any reason."\(^8\)

    Lesson \(\PageIndex{5}\):

    Centralization may provide economies of scale, but it can also reduce robustness—a single failure can interfere with many unrelated activities. This phenomenon is commonly known as introducing a single point of failure. By carefully adding redundancy to a centralized design one may be able to restore some of the lost robustness, but it takes planning and adds to the cost.


    \(^8\) Chofetz Chaim (the Rabbi Israel Meir HaCohen Kagan of Radin), paraphrased by Rabbi Yaakov Menken, in a discussion of lessons from the Torah in Project Genesis Lifelinehttp://www.torah.org/learning/lifeline/5758/reeh.html. Suggested by David Karger.  

     

    Multiple Failures: The SOHO Mission Interruption

    "Contact with the SOlar Heliospheric Observatory (SOHO) spacecraft was lost in the early morning hours of June 25, 1998, Eastern Daylight Time (EDT), during a planned period of calibrations, maneuvers, and spacecraft reconfigurations. Prior to this the SOHO operations team had concluded two years of extremely successful science operations.

    "…The Board finds that the loss of the SOHO spacecraft was a direct result of operational errors, a failure to adequately monitor spacecraft status, and an erroneous decision which disabled part of the on-board autonomous failure detection. Further, following the occurrence of the emergency situation, the Board finds that insufficient time was taken by the operations team to fully assess the spacecraft status prior to initiating recovery operations. The Board discovered that a number of factors contributed to the circumstances that allowed the direct causes to occur."\(^9\)

    In a tour-de-force of the keep digging principle, the report of the investigating board quoted above identified five distinct direct causes of the loss: two software errors, a design feature that unintentionally amplified the effect of one of the software errors, an incorrect diagnosis by the ground staff, and a violated design assumption. It then goes on to identify three indirect causes in the spacecraft design process: lack of change control, missing risk analysis for changes, and insufficient communication of changes, and then three indirect causes in operations procedures: failure to follow planned procedures, to evaluate secondary telemetry data, and to question telemetry discrepancies.

    Lesson \(\PageIndex{6}\):

    Complex systems fail for complex reasons. In systems engineered for reliability, it usually takes several component failures to cause a system failure. Unfortunately, when some of the components are people, multiple failures are all too common.


    \(^9\) Massimo Trella and Michael Greenfield. Final Report of the SOHO Mission Interruption Joint NASA/ESA Investigation Board (August 31, 1998). National Aeronautics and Space Administration and European Space Agency. http://sohowww.nascom.nasa.gov/whatsnew/ SOHO_final_report.html.